BRIEF DESCRIPTION OF THE WORKS
a) Package 1:
The project works consist of the upgrade of Road 150 and Al Bustan Road to Cater for the signalized Junctions at the intersections between South Boulevard and both Roads 150 and Al Bustan, the construction of Road 120, South Boulevard and Center Road with the related junctions up to the limit of works (L.O.W) just before the entrance to the private compounds. The works include the construction of service roads and footpaths. The total approximate length of road construction in this package is: 64m Corridor - 395m 52m Corridor - 3,500m Service Roads - 1,460m
b) Package 2:
The project works consist of construction of service roads and footpaths on the peripheral roads (no. 17 and 20) around block F area of Al Waab City, Roads no. 18 and 19 connecting the peripheral roads (no. 17 and 20) with the South Boulevard, Roads 22 and 23 connecting the peripheral road 17 with road 150 and existing compound and road 21 connecting the Centre Road. The total approximate length of road construction in this package is: 20m Corridor - 1,800m 16m Corridor - 1,000m
c) Package 3:
The project works consist of construction of service roads and footpaths confined by the South Boulevard Road, Al Bustan Road, Road 21 and Center Road. The total approximate length of road construction in this package is: 20m Corridor - 600m 16m Corridor - 3,000m
The works in Packages 1, 2 and 3 consist of, but are not limited to, the following:
Surface drainage, trench soakaway system and some connections to the positive system Foul sewerage works Land Drains works TSE works Earthworks Granular sub-base Asphalt works Kerbing works, footpaths, and paved areas Traffic signs and road markings Traffic Control Signals Public utility services: provision for future services; diversions and protection of existing o Water works, full network o Street lighting, full network o Q-Tel works, full network o Electricity works
|