• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Media Hub > Press Releases Ashghal Starts Roads and Infrastructure Project in West Semaisma Package 1

Start of Roads and Infrastructure Project in West Semaisma (Package 1)

5/19/2020

The project serves 539 residential land plots in Semaisma West

The Public Works Authority ‘Ashghal’ announced the commencement of the Roads and Infrastructure Project in West Semaisma (Package 1) which aims to develop internal streets in the area and improve local traffic safety as well as upgrade infrastructure facilities to respond to residents needs and urban growth in the future.

The project is located east of Al Khor Road in Semaisma area, and is bordered by Semaisma West Street to the East and by Semaisma Road to the South. The implementation of upgrading works are divided into three geographical zones which will be carried out successively, and the duration of each phase will be one year while full completion of the project is scheduled for Q2, 2023.

Eng. Hamad Al-Badr, Project Engineer in the Roads Projects Department at Ashghal, stated that the project offers services for 539 residential plots in West of Semaisma through the provision of upgraded infrastructure services and enhanced local streets to improve the traffic flow and provide connectivity to future public facilities that will be established in the area, such as schools, mosques, commercial complexes and youth centres.

Eng. Al-Badr added: “The project’s scope of works involves developing a road network with a total length of 20.5 km equipped with road safety features and street lighting as well as road signs and marks. The project also features a 14.5-km-pedestrian and cycle track.

Furthermore, the project scope includes a 19-km-long foul sewer network, 36 km of surface and groundwater drainage network, and 7 km of Treated Sewerage Effluent (TSE) network. In addition, new sewage pipelines will be provided and connected with Qatar’s main sewage network. Construction works will also include an emergency flood area with a total capacity of 263,000 m3 to provide proper protection for the entire area against flooding and excess rainfall.

The Roads and Infrastructure in West Semaisma is being implemented by Iris Construction, at a cost of approximately QAR 304.8 million and is part of the New Subdivisions Program which is carried out by the Public Works Authority and includes a number of development projects across Qatar.