Construction of Preparatory School – (Preparatory Girls School at North Khalifa Town)

Brief description
  • The school consists of a two-storey main building and ancillary buildings such as: guard room, gardener room, driver’s room, substation & pump room with a total built up area of approximately 9165m2.
  • The school also includes: shaded car parking, bus parking, outdoor sports area and hard & soft landscaping. The entire aforementioned amenities are built within the 24,000 square meters plot enclosed by 3.80 precast concrete boundary walls.
  • The main building consists of 25 classrooms, art rooms, laboratories, teachers rooms, administrative offices, assembly & multipurpose halls, auditorium, toilets, and changing rooms. The school can accommodate as many as 625 students.
  • The main building is reinforced concrete structure with block work infill and the multipurpose and assembly halls are covered with steel structure and roof cladding system with central air conditioning.
Benefits
Providing the best educational environment for students between the age of 12 and 15 years old.
Project Information
Geographical Location N/A
Area Madinat Khalifa North
Sector Education
Total Cost 50,638,500 Q.R.
Status Complete
Type Buildings
Start Date 15 June 2011
Expected completion date Third quarter of 2013
Construction company
Redeco International Company
Consulting company
CEG INTERNATIONAL – Doha QATAR