Pumping Station 70 & Associated Pumping Mains

Brief description
C682/2: Pumping Station 70 & Associated Pumping Mains.
 
  1. Construction of an in-house designed 40m deep foul sewage pumping station – PS 70 and associated triple 1600mm diameter DI pumping mains discharging to the new Doha North Sewage Treatment Works (STW).
  2. In brief the component works include:
  • Screen chamber 40m deep by 22m internal diameter.
  • Lifting pumping station, 40m deep by 40m internal diameter, housing 8nr duty fixed speed dry well pumps rated at 1,316 l/sec each.
  • Forwarding pumping station located at ground level, housing 8 nr duty variable speed pumps rated at 1,316 l/sec each.
  • Motor control rooms.
  • HV and Generator buildings.
  • Administration building.
  • Workshop and Store buildings.
  • Odour control facility

      3. Ductile Iron pumping main; 3nr 1600mm dia. 14.3km each

Benefits

Though it is a part of the wider Doha North sewage treatment and associated works, the project not only calls for the construction of several complicated structures on a 200 x 200m site that must also blend in with the residential area when completed, but also for a triple 1600mm pumping main to feed the new Doha North Sewage Treatment Works (STW), 25km away.

Project Information
Geographical Location N/A
Area Al Kheesa
Sector Drainage Projects
Total Cost 1,747,760,157 Q.R.
Status Complete
Type Drainage
Start Date 22 March 2009
Expected completion date Third quarter of 2014
Construction company

VINCI-QDVC-EC JOINT VENTURE

Consulting company

KEO INTERNATIONAL CONSULTANTS (Project Management Consultants)
STANLEY CONSULTANT INC. (Supervisor)