Roads and Infrastructure in Al Ebb and Leabaib, Package 03

Brief description

This project will contribute to the provision of integrated infrastructure in El Ebb and Leabaib Area within its remits bordered by Al Shamal Road to the west, Al Kheesa Road to the north and Al Ebb Road to the south, upgrading the roads network and drainage services in Al Ebb and Leabib area for 1,633 cictizens’ subdivisions.

The project includes the development of sewage systems, rainwater drainage lines, modernization of the treated water system and paving work, as well as the provision of lighting poles, traffic lights and parking lots.

The project will be implemented in five phases to ensure that traffic in the area and the daily life of the population are not affected.

Benefits

The project includes:

  • Providing integrated roads network of 38 km to reduce traffic congestion and enhance traffic safety on the road.

  • Providing 39 km of pedestrian and cycle paths and installing modern lighting systems and 1840 street lighting poles.

  • Landscaping and beautification works in the area and increasing the number of parking spaces to 6721 slots.

  • Developing a 40-km rainwater and groundwater network, a 39-km sewage network, 19-km-long TSE network as well as drinking water lines. 

Project Information
Geographical Location N/A
Area Multiple Areas
Sector Infrastructure Projects
Total Cost 71,867,132,775 Q.R.
Status In progress
Type Drainage
Start Date 24 October 2019
Expected completion date Third quarter of 2025
Construction company

​Al Darwish Engineering

Consulting company

​KEO International Consultants