• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Roads and Infrastructure in Umm Slal Mohammed, Package 01

Brief description

​Package One of Roads & Infrastructure Project in Umm Slal Mohammed aims at providing integrated infrastructure that will be constructed with advanced services along with internal streets to improve streamlined traffic flow and linking with public utilities to be constructed in the area in future. This project is part of the Public Works Authority’s efforts to provide full infrastructure, upgraded roads network and utility services across Qatar.

Benefits

​The project serves 623 plots of citizens' subdivisions in Umm Slal Mohammed Area and includes development and construction of a 36-km road network with provision of traffic safety elements such as street lighting systems and poles, signboards and road markings, as well as the provision of 4,310 parking slots.

Within the scope of the project, a 54-km-long surface and groundwater drainage network will be constructed and linked to the main surface water drainage network in order to protect the area from risks of flooding during rainy season. Another 15.8 km treated water network will be constructed to serve future green areas, besides establishing a 10 km-long potable water network. New drainage pipes will be installed and extended to connect with the main drainage network and the present system of using household septic tanks will be eliminated.

Project Information
Geographical Location N/A
Area Umm Slal Ali
Sector Infrastructure Projects
Total Cost 616,000,000 Q.R.
Status In progress
Type Drainage
Start Date 20 December 2020
Expected completion date Fourth quarter of 2024
Construction company

​HBK Contracting Company

Consulting company

​KEO Consultancy