POST CONTRACT PROFESSIONAL GENERAL , SITE SUPERVISION & QUANTITY SURVEYING CONSULTANCY SERVICES FOR LABOUR ACCOMMODATION AND TRUCKS PARKING AT AL SHAMAL BA/13-14/S/070/I
Tender Number
PWA/ITC/007/13-14
Tender Type
ITC
Tender Participants
Consortium ,
Tender Status
Archived
Tender Bond
70,000 Q.R.
Tender Category
Building ,Consultancy
Issuing Date
08 January 2014
Closing Date
09 February 2014
Document Fees
750 Q.R.
Tender Details:
The Site Supervision Services to be carried out by the Consultant shall include but are not necessarily limited to:
a) monitoring / inspection of work;
b) ensuring the Health & Safety requirement is being carried out in compliance with the Contract and the PWA safety requirements. Safety reports shall be submitted on weekly bases according to the format required by the Engineer;
c) ensuring the Works is being carried out in compliance with the Contract requirements;
d) assume and verify the quality of material at site;
e) check and approve work, in compliance with the specifications;
f) prepare list of outstanding works;
g) issue non-conformance notices, and ensure that prompt close out of non-conformance is managed;
h) review co-ordinate and recommend contractor's technical transmittals;
i) process the reply(ies) to technical queries;
j) co-ordinate distribution of design documents;
k) process changes to the original design proposed by Contractor;
I) attend progress and technical meetings with the Engineer, the PWA, contractors and engineers. Carry out any duty as delegated by the Engineer. Provide and distribute Minutes of Meetings (MOM);
m) examine and report on the Contractors proposed method statements and programme;
n) inspect materials, manufactured goods, equipment and site work as necessary to ensure that the whole works are being carried out in accordance with the contract documents and advise the Engineer and the Contractor if they are not satisfactory;.
o) develop, with the contractor, the Inspection and Test Plan (ITP), and clearly identify and schedule the Witness and Hold points for inspection;
p) witness the checking of surveying instruments and the calibration of equipment, including torque wrenches, pressure gauges and piling equipment;
q) witness tests on materials, manufactured goods, machinery, equipment and site work required by the Specifications, by good practice and by a Schedule of Tests to be provided by the Engineer and advise the Contractors regarding results;
r) witness the driving of all piles and witness all pile tests and inspect all pile records;
s) inspect and accept all excavations for foundations before concreting. Advise the Engineer of any significant geotechnical change encountered;
t) inspect and accept all embedded work, including reinforcing steel and conduits, before it is covered up;
u) check the principal survey points and the principal temporary bench marks on the site and the line and level of the Works from time to time;
v) make arrangements for the commissioning of the electrical and mechanical installations, and for the witnessing of acceptance tests by all concerned parties and government departments;
w) submit a Weekly Report or Reports at such frequency as the Engineer requires. The format and content of the reports shall be agreed with the Engineer during the setting up of the Management System for the project. The reports shall include, but not limited to statements regarding:-
1. Labour and supervision on site.
2. Plant and equipment on site.
3. Progress in relation to the Contractors original and current programmes. Report to show planned, actual percentage of each activity, progress brief, Contractor’s resources on site, two weeks look ahead, progress photographs, material submitted status, drawing status etc. The report to be generated by the Consultant and to be submitted in hard and soft copy.
4. Activities started during the week.
5. Activities completed during the week.
6. Major deliveries to site.
7. Any discrepancies between the Works and the requirements of the contract documents.
8. Health and safety issues and records
9. Data collection required for deciding duration and resources on each activity.
10. Advise the Engineer in the event of any persistent failure by the Contractors to comply with the contract documents and in the event of an unsatisfactory rate of progress.
 
 
Document Fees
750 Q.R.
Contact Details
Engineering Services Department
Public Works Authority
Fax No. (+974) 44950777