Al Sheehaniya-Leatooriya Road open to Traffic
                                    
                                
                             
                            
                                22 September 2016
                            
                         
                     
                 
                
                    Al Sheehaniya-Leatooriya Road open to Traffic
                
                
                    22 September 2016
                
                
                    https://www.youtube.com/embed/w6g5np7NPTM
                
                
                    Al Sheehaniya-Leatooriya Road is a main linking route, extending 13 km from Dukhan Highway and Al Sheehaniya Camel Race Track to the regional town of Leatooriya. It is part of the 29-km Al Sheehaniya – Leatooriya – Lijmiliya Road expressway project.
The video illustrates the Al Sheehaniya-Leatooriya Road latest upgrade to have the road been opened to traffic: two-lane expansion, new water, power and communication lines, safety measures, including guardrails, rumble strips, 300 street lights, high-visibility lane markings and speed cameras