The Construction, Completion and Maintenance of Porta cabins and the associated MEPD works at Salwa Operation and Maintenance Department .
The Scope of the Works shall include:
1. Site preparations.
2. Detail Design and Shop Drawings.
3. Fabricate, Supply and Installation New Port Cabin.
4. Site soft and hard landscape round the new port cabin.
5. To provide and extend all the services required for the operation of the building services, electrical, water and drainage connection.
6. Supply and Installation of sufficient no. of Mitsubishi AC unit.
7. Electric connection to the main panel.
8. Connecting drainage to the nearest exchange sewage slot.
9. Water connection from the nearest source.
The Construction total duration is 120 days.