Description
The project, located west of Doha at the limit between zones 80 and 71, consists mainly of the following elements: Part 1: The construction of a two lanes dual carriageway, running west to east, for about 8.5km, with necessary safety barriers and tying into existing roads at both ends as shown on the relevant drawings. Part 2: MV Electrical Packaged Substation with connecting cables to existing substation, as shown on the relevant drawings. Part 3: Surface Water Drainage (SWD) consisting mainly of swales and ditches, in addition to crossing culverts. Part 4: Animal fence surrounding the full length of the carriageway, as a protection against intrusion. Part 5: Removal and replanting of existing trees, clashing with the widening of the road, in coordination with the relevant municipal authority.
Company Nationality
  • ALL
Vendor Grade
  • A (Grade 1)
  • B (Grade 2)
  • C (Grade 3)
Vendor Classification and Activities