• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Media Hub > Press Releases Temporary Diversion in Both Directions on Mesaieed Road

Temporary Diversion in Both Directions on Mesaieed Road

9/8/2015

The diversion which is 1 km in length is located 10 km from Al Wakra and 7.5 km north of Mesaieed Industrial City and the alternative route is approximately 4 Km from Sealine Petrol Station.

The Public Works Authority announced that a temporary diversion will be put in place in both directions on the industrial road known as Mesaieed Road. The diversion which is 1 km in length is located 10 km from Al Wakra and 7.5 km north of Mesaieed Industrial City and the alternative route is approximately 4 Km from Sealine Petrol Station. The diversion will start on 9 September 2015 and will last 17 months until mid-February 2017.

The alternative route will be in the form of a roundabout enabling vehicles traveling on Mesaieed Road toward Al Wakra and vehicles coming from Al Wakrah in the opposite direction to bypass the construction zone and return to the original road (as shown in the attached map).

Ashghal is implanting this temporary diversion to allow the construction of bridges and associated road works on the Orbital Highway Project.

Ashghal requests all road users to abide by the speed limit, and follow the road signs to ensure all road users’ safety