• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Industrial Area Road

Brief description

Industrial Area Road is a 12.5 killometre of new dual carriageway. The project include five main multi-level interchanges.

Benefits

​The project is located to the south of the Industrial Area, from East Street 33 Intersection, one of the 5 main interchanges of the project, to Bu Hamour Intersection (Al Jazeera Interchange on F-Ring Road). The project is 12.5 killometre with 4 lanes in each direction.

Industrial Area Road include the construction of 30 killometre of pedestrian and cycling lanes.

The project include five main mulita-level Interchanges:

East Street 33 Intersection:

3 level interchange including, at-grade signalized intersection underpass and flyover

Umm Al Seneem Intersection:

2 level interchange including, at-grade signalized intersection and underpass

Wadi Lubara Intersection:

2 level interchange including, at-grade signalized intersection and underpass

Messaimeer Intersection:

3 level interchange, including at-grade signalized intersection underpass and flyover

Bu Hamour Intersection:

2 level interchange including, at-grade signalized intersection and underpass

The project also include the construction of Barwa City access (Barwa Directional Tunnel), a unidirectional tunnel with a total length of 650 metres.

Project Information
Geographical Location N/A
Area Multiple Areas
Sector Expressway Programme
Total Cost 2,333,858,204 Q.R.
Status Complete
Type Roads
Start Date 15 July 2012
Expected completion date First quarter of 2019
Construction company

Al Jaber Transport & General Contracting

Consulting company

Parsons International Limited.