• الدخول
  • التسجيل
  • اتصل بنا
  • خريطة الموقع
الوصف
The Public Works Authority intends to Supply, Replace and Install new wallpaper for its buildings on an as-needed basis (call-off) over a period of two years. The work shall be carried out in accordance with the specifications Delivery Location The items shall be delivered and installed at the PWA tower, or any other location as specified in supply order. Project Timeline/Duration The contract duration shall be for Twenty-Four (24) months Call-off starting from the Commencement Date or the total amount reaches 800,000 QR, whichever comes first and based of “Call-off” basis.
جنسية الشركات
  • Local
درجة الشركات
  • All
تصنيف الشركات وأنشطتهم
المرفقات