The project consists of a 65 km-long TSE transmission pipeline that runs starting at the existing Doha South Sewage Treatment Works (STW) and to be laid along the main service route of Salwa Road, passing through the Rakhiya farms and surrounding areas and up to the TSE Storage Lagoons where excess treated wastewater is stored.
The project also includes the construction of a pumping station with a capacity of 120,000 cubic metres/day which will pump the TSE flow from the Doha South STW to the seasonal storage lagoons.
This is in addition to the mechanical, electrical and related equipment works.