• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Temporary Package Treatment Plants (PTPs) at Various Locations

Brief description

Design and construction of two Temporary Package Treatment Plants, each is designed to treat 10,000 m3/day.

The plants are located at Al Karaana and Umm Birka, and both are operated as per the mechanical activated sludge process.

Benefits

Providing two package treatment plants that are exclusively designed for tankers reception and for treating the tankered sewage to produce TSE suitable for irrigation and agricultural purposes. The TSE is used to irrigate the green area planted by HASSAD within the same parcel.

The strategic intention of this project was to eliminate the disposal of tankered sewage into Al Karaana lagoon.

Project Information
Geographical Location N/A
Area Multiple Areas
Sector Drainage Projects
Total Cost 294,888,888 Q.R.
Status Complete
Type Drainage
Start Date 03 March 2011
Construction company

Protec

Consulting company

AECOM