Access Road to Al Wakrah Logistic City and Grading and Temporary Roads for Birkat Al Awamer

Brief description
The project is divided to three packages; package 8 work comprises construction of the proposed access road to Al Wakrah Logistics City, which consists of three-lane dual carriageway. Works also include surface water drainage networks and street lighting, in addition to the installation of electrical cables. Package 9 involves construction of two-lane dual carriageway to be built now with provision for additional one-lane future expansion on each side of the carriageway as part of the link road and access roads to Birkat Al Awamer Integrated Worker Accommodation Community. Package 10 works comprise construction and maintenance of the four-lane dual carriageway within the Bu-salba area.
Benefits
The project will provide access roads for Birkat Al Awamer Integrated Worker Accommodation Community, in addition to providing roads to the land plots, surface drainage system, and pedestrian walkaways. The project will also provide complete roads and infrastructures for future commercial businesses in the area.
Project Information
Geographical Location N/A
Area Al Wakra
Sector Infrastructure Projects
Total Cost 357,036,627 Q.R.
Status Complete
Type Drainage
Start Date 20 August 2017
Expected completion date Third quarter of 2018