• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Al Sadd Intersection Development Project

Brief description

The project aimed to upgrade Al Sadd intersection by expanding it and developing the infrastructure utilities' services, in addition to upgrading Al Sadd Street and Jawaan Street, as part of the Road Improvement Works in Various Areas of Greater Doha - Phase 9.

Benefits

Project works included the upgrade of Al Sadd intersection and its infrastructure utilities, in addition to upgrading the roads adjacent to this intersection such as Al Sadd Street and Jawaan Street at a total length of 3.2 Km. The traffic signal at Al Sadd intersection was also upgraded, in addition to providing pedestrian and cycle lanes with a total length of 6.4 km, providing road markings and directional signs, and upgrading the street lighting system.

In addition, works involved upgrading the 4 km-long stormwater and surface water drainage network, the 1.5 km-long sewage network, and the 1.5 km-long TSE lines, in addition to providing protection for the existing power lines and telecommunications cables, and installing new asphalt layers. Beautification and landscaping works were also implemented alongside both streets and in the median to provide 53,000 square metres of green areas.

Project Information
Geographical Location N/A
Area Al Sadd
Sector Local Roads
Total Cost 40,000,676 Q.R.
Status Complete
Type Roads
Start Date 01 June 2020
Expected completion date Fourth quarter of 2021
Construction company

​JH Construction Company

Consulting company

​Gulf Engineering and Industrial Consultancy