• Login
  • Register
  • Contact Us
  • Site Map

Ashghal > Home > Our Projects Project Details

Roads and Infrastructure in Al Ebb and Leabaib, Package 03

Brief description

​This project will contribute to the provision of integrated infrastructure in El Ebb and Leabaib Area within its remits bordred by Al Shamal Road to the west, Al Kheesa Road to the north and Al Ebb Road to the south, upgrading the roads network and drainage services in Al Ebb and Leabib area for 1276 cictizens’ subdivisions.

The project includes the development of sewage systems, rainwater drainage lines, modernization of the treated water system and paving work, as well as the provision of lighting poles, traffic lights and parking lots.

The project will be implemented in five phases to ensure that traffic in the area and the daily life of the population are not affected.

Benefits

​The project includes:

  • Providing integrated roads network of 39 km to reduce traffic congestion and enhance traffic safety on the road.
  • Providing 87 km of pedestrian and cycle paths and installing modern lighting systems and 1809 street lighting poles.
  • Landscaping and beautification works in the area and increasing the number of parking spaces by 6721 slots.
  • Developing a 75-km rainwater and groundwater network, a 33-km sewage network, 23-km-long TSE network as well as drinking water lines.
Project Information
Geographical Location N/A
Area Multiple Areas
Sector Infrastructure Projects
Total Cost 71,867,132,775 Q.R.
Status In progress
Type Drainage
Start Date 24 October 2019
Expected completion date Third quarter of 2024
Construction company

​Al Darwish Engineering

Consulting company

​KEO International Consultants