Invitation to Submit Prequalification Application for Design and Construction
The Public Works Authority (PWA) in the State of Qatar invites global leaders in design and construction services to submit their Prequalification Application showing
their expression of interest for the following Project:
New District of Doha (NDOD) Contracts 2 &3 – Tunnels – CP796/2 & CP796/3
South of Wakrah Contracts 2&3 – Tunnels – CP803/2 & CP803/3
BRIEF DESCRIPTION OF THE WORKS
The primary aim of the New District of Doha (NDOD) and South of Wakrah (SOW) strategic projects is to alleviate current flooding issues and to provide long term future stormwater management infrastructure in line with 2030 Vision and the Qatar Integrated Drainage Master Plan. Existing and future LRDP projects will transfer storm and ground water flows onto the strategic tunnel systems where flows will gravitate to strategically located pumping stations, flows will then either be pumped to sea via a marine outfall and or stored within the inland storage lagoon.
Scope of work under this prequalification for Contracts CP796/2, CP796/3, CP803/2, & CP803/3 include the design and construction of onshore storm water tunnels and access shafts up to Total length of approximately 43km in each of the NDOD & SOW project catchment boundaries. ID ranges from approximately 3.0 to 6.0m in diameter. Depth ranges from approximately 18 to 51m.
PRE-QUALIFICATION DOCUMENTInterested companies are invited to visit the PWA website :
www.ashghal.gov.qamain page for the link to download the prequalification document which sets out the requirements for the Prequalification Application. Applicants shall visit the PWA website frequently during submission period for further updates (if any).
SUBMISSION OF PRE-QUALIFICATION APPLICATIONThe closing date for submitting the Prequalification Application is
14th August 2022 (Sunday), not later than 01:00 pm (local Doha time, GMT +3:00).Scanned softcopies on Two (2) labelled DVD’s in Pdf format of the Prequalification Application shall be submitted to:
Public Works Authority
P.O.Box: 22188 Doha, State of Qatar
Al Nakheel Tower 3, Ground Floor
Manager of Engineering Services Department
E-Mail:
esd.tenders@ashghal.gov.qaTitle: New District of Doha (NDOD) Contracts 2 &3 – Tunnels – CP796/2 & CP796/3
South of Wakrah Contracts 2&3 – Tunnels – CP803/2 & CP803/3