Contractors
|
Roads Specialization (Methods)
|
The Contractor having Grade 1 or 2 for Road Works, should propose a Subcontractor with minimum Grade 2 for Building works, in case the Contractor itself does not possess the classification of minimum Grade 2 of Building works.
|