1.01 Location of the Sites
The Sites are located at at Al Khessa and Al Wukair, State of Qatar as indicated on the site location plans.
1.02 Brief Description of the Works
The Works comprises construction, completion and maintenance of Three (3) New Schools as follows:
1. Construction of school at Al Khessa pin No. 70101723
2. Construction of school at Al Khessa Pin No. 70210100
3. Construction of school at Al Wukair Pin No. 91021815
The Work in each school consist but not limited to
classrooms, art rooms, laboratories, library, teachers rooms, administrative offices, assembly & multi-purpose halls, auditorium, canteen, kitchen, pantries, toilets, changing room, services rooms, ancillary buildings, water tank yard, sports courts, hard & soft landscaping, shaded structures, parking, boundary walls, fence & gates, etc… including external site services infrastructures.
The Buildings are reinforced concrete structure with blockwork infill. The assembly and multipurpose halls are covered with space frame/structural steel structure and roof cladding system.
The Works may also include necessary demolition & alterations of existing structures such as buildings, permanent & temporary facilities, boundary walls, fences & gates, roads, walkways, hard & soft landscaping, steel structures & sheds; removal/relocation of trees and disconnection and/or re-routing of existing services depending on the actual condition of the Sites mentioned above. Any existing items on site required by PWA/End-user shall be carefully removed and delivered as per PWA’s direction.
In case, the existing substation located on site is also supplying electricity to other facilities/structures has to be demolished, the same shall only be demolished upon completion of the new substation including the necessary connection from KAHRAMAA and the permanent power supply to the aforesaid facilities/structures is connected by the Contractor or the Contractor shall provide temporary arrangement for uninterrupted supply for the full operation of the aforementioned facilities/structures complete with all necessary expenses until the same are permanently connected to the new substation.
The Works in all the Sites shall commence simultaneously on the date stated on the formal Contract Agreement for a total duration of 600 Calendar days plus Six Hundred (600) days Maintenance Period.