You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Advanced Search
Login
Register
Register as an Individual
Register as a Company
Register as a Government
Register as a Turkish Manufacturer
Contact Us
Site Map
Home
About Us
Overview
President's Message
Organisation Chart
Mission, Vision & Values
Our Projects
Overview
Roads
Buildings
Drainage
Beautification Committee
Tenders & Auctions
Overview
General Tenders
e-Tenders (GTC/ITC/STC)
Pre-Qualifications - Expression Of Interests
Participation Terms
Display of Offers
Display Of Awarding
e-Tenders Registration
Contractors e-Payment
Media Hub
Overview
Press Releases
Photo Gallery
Video Gallery
Events & Activities
Email Alerts & SMS
Careers
Vacancies
Recruitment Partners
Work Environment
Internship Program
Customer Zone
E-Services
Other Services
Follow
javascript: SP.SOD.executeFunc('followingcommon.js', 'FollowDoc', function() { FollowDoc('{ListId}', {ItemId}); });
0x0
0x0
ContentType
0x01
1100
Compliance Details
javascript:if (typeof CalloutManager !== 'undefined' && Boolean(CalloutManager) && Boolean(CalloutManager.closeAll)) CalloutManager.closeAll(); commonShowModalDialog('{SiteUrl}'+ '/_layouts/15/itemexpiration.aspx' +'?ID={ItemId}&List={ListId}', 'center:1;dialogHeight:500px;dialogWidth:500px;resizable:yes;status:no;location:no;menubar:no;help:no', function GotoPageAfterClose(pageid){if(pageid == 'hold') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/hold.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'audit') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Reporting.aspx' +'?Category=Auditing&backtype=item&ID={ItemId}&List={ListId}'); return false;} if(pageid == 'config') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/expirationconfig.aspx' +'?ID={ItemId}&List={ListId}'); return false;} if(pageid == 'tag') {STSNavigate(unescape(decodeURI('{SiteUrl}'))+ '/_layouts/15/Hold.aspx' +'?Tag=true&ID={ItemId}&List={ListId}'); return false;}}, null);
0x0
0x1
ContentType
0x01
898
Document Set Version History
/_layouts/15/images/versions.gif?rev=43
javascript:SP.UI.ModalDialog.ShowPopupDialog('{SiteUrl}'+ '/_layouts/15/DocSetVersions.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
330
Send To other location
/_layouts/15/images/sendOtherLoc.gif?rev=43
javascript:GoToPage('{SiteUrl}' + '/_layouts/15/docsetsend.aspx' + '?List={ListId}&ID={ItemId}')
0x0
0x0
ContentType
0x0120D520
350
Ashghal
>
Home
>
Tenders & Auction
Tenders Listing
Overview
General Tenders
Open Tenders
Closed Tenders
Archived Tenders
Archived Tenders
Participation Terms
e-payment Guide
Open Prequalifications
Closed Prequalifications
Archived Prequalifications
Pre-qualifications
e-Tenders (GTC/ITC/STC)
Open e-Tenders
Closed e-Tenders
Archived e-Tenders
e-Tendering User Guide
Pre-Qualifications - Expression of Interests
Open Pre-Qualifications
Closed Pre-Qualifications - Expression of Interests
Archived Pre-Qualifications - Expression of Interests
Participation Terms
Display of Offer
Display of Awarding
e-Tenders Registration
Tender
Print
Email
Email
Replacement/Upgrading of the Existing Sewer Lines at Ibn Abi Sulma Street, Al Mansoura Area AA/10-11/M/006/S
Tender Number
PWA/STC/016/10-11
Tender Type
STC
Tender Participants
Qatari only ,
Tender Status
Archived
Tender Bond
25,000 Q.R.
Issuing Date
16 June 2010
Closing Date
05 July 2010
Document Fees
500 Q.R.
Brief Description:
N/A
Tender Details:
Work shall include replacement of existing pipeline , in the same trench , this is true for majority of the work , but in small part the line will be rerouted or changing the levels as per the attached plan , as per Engineer instruction as following:- Contractor is responsible to carry out any work may found necessary to complete in proper manner and not specified in the attached BOQ. Excavation in any material or any location , including, cutting bit Mac at major road or minor road as necessary, excavation in existing trench, which may need trimming or a new trench ,under or above water table, in soft or hard soil . Bedding, including granular bedding and surround or plain concrete bedding and surround & in exceptional cases sand bedding may be used. The contractor is responsible to do the connection between the existing House connection lines and the new sewer line without claiming any additional cost. Back filling work , in layers , work shall include back filling the existing trench with the use of selected fill , in layers not exceeding 200mm depth , compaction every layer up to or exceeding the maximum dry density of the soil , work also include dispose all surplus material properly and cleaning the site . Reinstatement work, including any kind of surface finishing, including, bitmac, or interlock / bricks flooring or concrete flooring or any sort of tiling work as required. All work shall be undertaken in accordance with Drainage Affairs requirements for sewerage projects as detailed in Qatar Construction Specification ( QCS) and the recent Drainage Affairs supplement thereto
Document Fees
500 Q.R.
Contact Details
Engineering Services Department
Public Works Authority
Fax No. (+974) 44950777
Email:
esd.tenders@ashghal.gov.qa
Home
Tenders & Auctions
Customer Zone
Accessibility
Privacy
Site Map
Contact Us
Subscribe to Email Alerts & SMS
About Us
Our Projects
Media Hub
Careers
Social Media
Terms and Conditions
Ashghal staff portal
All Rights Reserved - Ashghal ©