• الدخول
  • التسجيل
  • اتصل بنا
  • خريطة الموقع
الوصف
The scope of work includes Supply, Replace and Install new Carpet for PWA buildings (Tower 1 & Tower 2) on an as-needed basis (call-off) over a period of two (2) years. The work shall be carried out in accordance with the specifications outlined below. The final selection will be determined and confirmed during the design phase or material approval process. The scope of work shall cover disposing of old carpets at an approved site. CONTRACT DURATION The contract duration shall be for Twenty-Four (24) months Call-off starting from the Commencement Date or the total amount reaches 1,800,000 QR, whichever comes first. The Maintenance Period shall be Four Hundred (400) Days from the Completion Date pursuant to Article 10 of Contract Agreement. Contractor shall guarantee the works from all defects and damages from the date of completion certificate.
جنسية الشركات
  • Local
درجة الشركات
  • All
تصنيف الشركات وأنشطتهم
المرفقات