• الدخول
  • التسجيل
  • اتصل بنا
  • خريطة الموقع
الوصف
This Scope of Work outlines the responsibilities and deliverables for the dismantling, supply, installation, testing, and commissioning of two (2) passenger elevators at HQ2 Asset Affair building. The elevators shall be installed in accordance with all applicable local and international standards, including safety, accessibility, QCS specifications, and performance requirements. The contract duration shall be 12 months from the Commencement Date plus 400 days of Maintenance period from Completion Date.
جنسية الشركات
  • Local
درجة الشركات
  • All
تصنيف الشركات وأنشطتهم
المرفقات