• الدخول
  • التسجيل
  • اتصل بنا
  • خريطة الموقع
الوصف
1. PROJECT OBJECTIVE This Scope of Work outlines the responsibilities and deliverables for the dismantling, design, supply, installation, building interfaces, required approvals, testing, commissioning and handing over of two (2) passenger elevators at HQ2 Asset Affair office building. The elevators shall be installed in accordance with all applicable local and international standards, including safety, accessibility, QCS specifications, and performance requirements. 2. PROJECT TIMELINE/DURATION The contract duration shall be 12 months from the Commencement Date plus 400 days of Maintenance period from Completion Date.
جنسية الشركات
  • Local
درجة الشركات
  • All
تصنيف الشركات وأنشطتهم